The 1st Unit for the 3 x 55 MW Balingasag TPP of Minergy Coal Corporation was installed and successfully commissioned in March 2017 with ELEX Electrostatic Precipitator supplied by Elex India through the Boiler supplier ThyssenKrupp India. The Contractor for this plant is TPSC and Mitsubishi Corporation.